Hidrosogamoso dam, Colombia

Displacement, grab of sources of livelihood, militarization and misrecognition of all such impacts on the affected peoples. All ingredients for one of the most controversial dam projects in Colombia


Description

El proyecto consiste en la construccion de una presa hidroelectrica sobre el rio Sogamoso; el area de influencia en la cuenca hidrografica del rio abarca la jurisdiccion de cinco municipios en el departamento de Santander: Giron, Betulia, Los Santos, Zapatoca, San Vicente de Chucurí.

See more...
Basic Data
NameHidrosogamoso dam, Colombia
CountryColombia
ProvinceSantander
SiteGiron, Betulia, Los Santos, San Vicente de Chucurí, Zapatoca
Accuracy of LocationMEDIUM regional level
Source of Conflict
Type of Conflict (1st level)Water Management
Type of Conflict (2nd level)Dams and water distribution conflicts
Land acquisition conflicts
Water access rights and entitlements
Specific CommoditiesWater
Land
Electricity
Project Details and Actors
Project DetailsLa presa tendrá una altura de 190 metros y 345 metros de longitud de cresta. La capacidad instalada será de 820 MW. El embalse ocupará 7000 hectáreas y tendró un volumen de agua almacenada de 4800 millones de metros cubicos (1920 millones corresponden a embalse util). La produccion media anual se estima en 5056 GWh, equivalentes al 10% del consumo de energia del pais. ISAGEN tiene una capacidad instalada de 2132 MW en el sistema interconectado nacional. La capacidad instalada de la presa será de 820 MW.La construccion de la presa requiere excavar metros cubicos. Además requiere la desviación del río Sogamoso, y la construccion de dos túneles. En la primera etapa se construyeron 6.8 kilometros de carreteras aguas arriba y aguas abajo de la presa y la inversion fue de 16 mil millones de pesos colombianos. (ISAGEN, 2010). Con el fin de disponer de la zona de cauce del rio sobre la cual se construye la presa, es necesario que este sea desviado a traves de dos tuneles revestidos en concreto que tienen cada uno 11 metros de diametro y longitudes de 830 m. y 860 m.

Aparte de las obras del Proyecto, ISAGEN debe construir las obras necesarias para reponer la infraestructura que interfiere con su construccion: Via Bucaramanga - Barrancabermeja, tramo comprendido entre Capitancitos y Linderos. En total Isagen invertir pesos 157 mil millones para la via sustitutiva Barrancabermeja- Bucaramanga, de los cuales $79 mil millones será para vias y puentes, asi como $78 mil seran invertidos en un sistema de tuneles.

Via a San Vicente de Chucurí, en el tramo comprendido entre La Renta y La Canan�.En San Vicente de Chucurí seran construidos 24,3 kms de vía nueva con cinco puentes de grandes dimensiones, cuya longitud sera de 1.149 metros. Adicionalmente, serán diseñados 12,2 kms de via que conectará a los sectores de la Estrella (Montebello) y Peñamorada. Puente Gomez Ortiz sobre el rio Sogamoso, en la via al municipio de Zapatoca. Puente Geo Von Lenguerke sobre el rio Sogamoso, en la via que conduce al municipio de Betulia. Lineas de transmision de energia, redes de fibra optica y un tramo del poliducto . (ISAGEN, 2012). El Proyecto Hidroelectrico obtuvo asignaciones de energia firme (Enficc), por 1.440 GWh/año para el periodo 2016 -2034, que representan un ingreso adicional para Isagen de US$407 millones.
Project Area (in hectares)7590
Level of Investment (in USD)1740000000
Type of PopulationRural
Potential Affected Population56,200 Pobn rural total municipios
Start Date2008
Company Names or State EnterprisesISAGEN from Colombia
Sacyr from Spain
Salini-Impregilo from Italy
Relevant government actorsMinisterio de Ambiente y Desarrollo Sostenible, Alcaldia de Sogamoso, Gobernacion de Santander, Asamblea Departamental, Procuraduria General, Defensoria del Pueblo, Diocesis de Barrancabermeja, Corporacion Autonoma Regional para la Defensa de la Meseta de Bucaramanga
International and Financial InstitutionsCorporación Andina de Fomento (CAF) from Venezuela
Japan Bank for International Cooperation (JBIC) from Japan
The Bank of Tokyo Mitsubishi UFJ (UFJ) from Japan
Banco Bilbao Vizcaya Argentaria (BBVA) (BBVA) from Spain
Nippon Export and Investment Insurance (Nexi) from Japan
Banco Santander from Spain
Credit Export Agency Euler Hermes from Germany
Environmental justice organisations and other supportersMovimiento Social en defensa del Rio Sogamoso (En: http://veredasogamoso.blogspot.com/), Movimiento Colombiano en Defensa de los Territorios y afectados por las represas Rios Vivos, Red Nacional de Pueblo Afectados y Amenazados por Represas y Trasvases., CENSAT Agua Viva, Universidad Autonoma de Bucaramanga UNAB, Universidad de Caldas, Corporacion SEMBRAR, Corporacion Compromiso, Red de emisoras comunitarias del Magdalena Medio-AREDMAG
The Conflict and the Mobilization
Intensity of Conflict (at highest level)HIGH (widespread, mass mobilization, violence, arrests, etc...)
When did the mobilization beginIn REACTION to the implementation (during construction or operation)
Groups MobilizingSocial movements
Artisanal miners
Local scientists/professionals
Fishermen
Landless peasants
Neighbours/citizens/communities
Women
Farmers
Local ejos
Local government/political parties
Forms of MobilizationBlockades
Community-based participative research (popular epidemiology studies, etc..)
Creation of alternative reports/knowledge
Development of a network/collective action
Involvement of national and international NGOs
Lawsuits, court cases, judicial activism
Media based activism/alternative media
Objections to the EIA
Official complaint letters and petitions
Public campaigns
Shareholder/financial activism.
Street protest/marches
Impacts
Environmental ImpactsVisible: Air pollution, Biodiversity loss (wildlife, agro-diversity), Food insecurity (crop damage), Global warming, Loss of landscape/aesthetic degradation, Noise pollution, Waste overflow, Deforestation and loss of vegetation cover, Surface water pollution / Decreasing water (physico-chemical, biological) quality, Large-scale disturbance of hydro and geological systems, Reduced ecological / hydrological connectivity, Soil erosion
Potential: Floods (river, coastal, mudflow), Groundwater pollution or depletion
OtherRisk of earthquake caused by the dam (potential)
Health ImpactsVisible: Accidents, Occupational disease and accidents, Other environmental related diseases, Mental problems including stress, depression and suicide, Violence related health impacts (homicides, rape, etc..)
Potential: Malnutrition, Health problems related to alcoholism, prostitution, Deaths
Socio-economic ImpactsVisible: Increase in Corruption/Co-optation of different actors, Displacement, Lack of work security, labour absenteeism, firings, unemployment, Loss of livelihood, Loss of traditional knowledge/practices/cultures, Militarization and increased police presence, Social problems (alcoholism, prostitution, etc..), Violations of human rights, Land dispossession, Loss of landscape/sense of place, Specific impacts on women
Potential: Increase in violence and crime
Outcome
Project StatusUnder construction
Pathways for conflict outcome / responseUnder negotiation
Corruption
New Environmental Impact Assessment/Study
Deaths
Migration/displacement
Strengthening of participation
Compensation
Violent targeting of activists
Criminalization of activists
Land demarcation
Repression
The construction of the 820 MW dam is going ahead.
Development of AlternativesSe realizo un acuerdo entre las compañias ISAGEN S.A., el Consorcio Impregilo ICT SAS, y las comunidades afectadas, el cual incluia 17 puntos a los que se comprometian las entidades. Este acuerdo incluia inversion social, capacitacion a los pescadores entre otras actividades. Pero segun las organizaciones locales y comunidades fue incumplido.

Las propuestas que se llevaron por parte de los grupos afectados incluia entre otros aspectos, que ISAGEN se comprometiera a realizar un estudio sismico en la zona donde se esta construyendo la hidroeléctrica, de alto riesgo.

ISAGEN tendria que reubicar a las comunidades asentadas en los predios donde se lleva la obra, asimismo reconocer� los derechos de propiedad de los campesinos sobre la tenencia de las tierras utilizadas y el derecho de los pescadores a utilizar la cuenca del rio Sogamoso.

En materia laboral, ISAGEN respetaria los derechos de sus trabajadores vinculados a la obra, especialmente el de asociacion y protesta, igualmente reconocería las horas extras laboradas, pagara los salarios a tiempo. Sin embargo, para las poblaciones afectadas no se ha cumplido con todos los puntos del acuerdo.
Do you consider this as a success?No
Why? Explain briefly.No se ha hecho justicia ambiental. La represa se construye. En los cuatro años que lleva el Movimiento en defensa del Rio Sogamoso, hubo una modificacion de la licencia ambiental (Resolucion 1497/2009) y a partir de la denuncia, movilizacion y bloqueo de las comunidades al proyecto se establecio un acuerdo en el que ISAGEN se comprometio a cumplir 17 puntos, estuvieron presentes los actores gubernamentales, ademas de otros que participaron como garantes de tal acuerdo, pero el acuerdo no se ha cumplido:

COMUNICAMOS Y DENUNCIAMOS que ISAGEN no ha cumplido con el total de los puntos contraídos por parte de su presidente, FERNANDO RICO, hasta hoy han sido incompletos: los acueductos siguen sin ejecutarse, la contaminacion y la destruccion ambiental es el pan de cada dia, la reubicacion, el proyecto se sigue adelantando bajo en regimen laboral de semiesclavitud y lo mas grave de todo es que se le siguen dando largas al gravisimo tema del riesgo sismico que representa el llenado del

embalse. (Marzo de 2012)

Las comunidades afectadas se han opuesto al proyecto y han manifestado en comunicaciones, que no ha habido en los procesos que ha adelantado ISAGEN una participacion publica adecuada, oportuna e integral.
Sources and Materials
Legislations

Resolucion 1497 de 2009: Modificacion licencia ambiental

Resolucin 2329 de 2009: Resolucion recurso reposicion interpuesto en contra de la Resolucion 1497

References

Movimiento Social en defensa del Rio Sogamoso (2011). El Rio Sogamoso se resiste a morir. Ponencia presenada en la Audiencia Minero energética

Soler Villamizar J. (2010). Hidrosogamoso mecanismo de desarrollo
[click to view]

Mendieta N. (2009). El impacto alimentario de Hidrosogamoso.

Ardila J. (2009). Sismicidad, otro riesgo de las hidroeléctricas.

Acevedo C. (2009). Hidrosogamoso: sin participacion, sin democracia.

Gomez M. (2009). Sin derecho a inundar. Un patrimonio lejos del olvido.

Roa Avendaño T. y Duarte B. (2012). Aguas represadas. El caso del proyecto Hidrosogamoso en Colombia.

ROA AVENDAÑO, T., DUARTE, B., “Desarrollo hidroeléctrico, despojo y transformación territorial: El caso de Hidrosogamoso, Santander, Colombia”. En Arroyo, Aline y Boelens, Rutgerd, Aguas Robadas. Despojo Hídrico y Movilización Social. Quito, Agosto 2013, Abya Yala, Justicia Hídrica y el Instituto de Estudios Peruanos, IEP

[1] Hidrosogamoso: Conflicto y resistencia

Tatiana Roa Avendaño - Ambientalista, coordinadora general de Censat Agua Viva | Colombia | 07/01/2016
[click to view]

Links

[click to view]

[click to view]

[click to view]

[click to view]

[click to view]

[click to view]

[click to view]

[click to view]

[click to view]

[click to view]

[click to view]

[click to view]

[click to view]

[click to view]

[click to view]

[click to view]

Media Links

Blog Veredasogamoso
[click to view]

Documental Hidrosogamoso:
[click to view]

Other Documents

View on the dam Fuente: http://semillas.org.co/es/revista/hidrosogamoso-conflicto-y-resistencia
[click to view]

Source: La Semilla
[click to view]

Meta Information
ContributorMario Alejandro Perez-Adriana Zamora
Last update16/11/2016
Comments