Hydroelectric Project Patuca III (Piedras Amarillas) , Honduras

Description

La construcción del Proyecto Hidroeléctrico Patuca III es parte del “Complejo Hidroeléctrico en el río Patuca” que busca producir un total de 524 megavatios mediante la producción de 270 megavatios en el Patuca I (La Valencia), 150 megavatios en el Patuca II (La Tarrosa) y 104 megavatios con Patuca III (Piedras Amarillas). El Patuca I y Patuca II actualmente están en fase exploratoria.

See more...
Basic Data
NameHydroelectric Project Patuca III (Piedras Amarillas) , Honduras
CountryHonduras
ProvinceOlancho
SitePatuca, Catacamas y Juticalpa
Accuracy of LocationHIGH local level
Source of Conflict
Type of Conflict (1st level)Water Management
Type of Conflict (2nd level)Dams and water distribution conflicts
Deforestation
Land acquisition conflicts
Specific CommoditiesLand
Water
Electricity
Project Details and Actors
Project DetailsEl PH Patuca III está ubicado en el departamento de Olancho al noreste de Tegucigalpa, tiene una capacidad instalada de 104 MW con una producción anual esperada de 336 GWh/año.

Se pretende construir una casa de máquinas compuesta por dos turbinas de 52 MW cada una, dos generadores con potencia de 53.1 MW y una línea de transmisión eléctrica de 34.5 KVA de 47 km de longitud.

El área del embalse es de 49 km² que inundará terrenos con los diferentes usos del suelo y tipos de vegetación (agrícola, agropecuario y diferentes tipos de bosques.

La longitud de cresta es de 207.1 m, espesor de 10 m. Cuenta con 5 vertederos y una descarga de fondo, el volumen de sedimentos anual esperado es 18.31 millones de toneladas.

Tiene una cortina de concreto: 57 metros de altura

Comprende una cuenca de drenaje de 12 330 km². Los ríos de los que se alimentan son el Río Guayape que cubre el 79% el Río Guayambre que abarca el 21 %
Project Area (in hectares)8, 966
Level of Investment (in USD)350, 000, 000.00
Type of PopulationRural
Potential Affected Population500 000 – 550 000
Start Date16/05/2011
Company Names or State EnterprisesTaiwan Power Company (Taipower ) - Estudios de factibilidad
Consultora GeoConsult S.A de C.V (GeoConsult) from Honduras - Supervisión de las obras
Sinohydro Corporation Limited (Sinohydro) from China
Relevant government actorsEmpresa Nacional de Energía Eléctrica (ENE), Secretaria de Recursos Naturales y Ambiente (SERNA)

International and Financial InstitutionsBanco Industrial y Comercial de China (ICBC) from China
Inter-American Development Bank (IADB)
Environmental justice organisations and other supportersAsociación Patuca, Organización Fraternal Negra de Honduras (OFRANEH), Federación indígenas Tawahka (FITH), Frente Nacional de Resistencia Popular (FNRP), Moskitia Asla Takanka, Moskitia Pawisa (MOPAWI)

The Conflict and the Mobilization
Intensity of Conflict (at highest level)MEDIUM (street protests, visible mobilization)
When did the mobilization beginIn REACTION to the implementation (during construction or operation)
Groups MobilizingIndigenous groups or traditional communities
International ejos
Local ejos
Social movements
Ethnically/racially discriminated groups
Forms of MobilizationInvolvement of national and international NGOs
Media based activism/alternative media
Objections to the EIA
Public campaigns
Street protest/marches
Occupation of buildings/public spaces
Impacts
Environmental ImpactsVisible: Biodiversity loss (wildlife, agro-diversity), Desertification/Drought, Floods (river, coastal, mudflow), Food insecurity (crop damage), Global warming, Loss of landscape/aesthetic degradation, Deforestation and loss of vegetation cover, Surface water pollution / Decreasing water (physico-chemical, biological) quality, Large-scale disturbance of hydro and geological systems, Reduced ecological / hydrological connectivity, Other Environmental impacts
OtherEmisión de gas metano, en la cuenca del río Patuca existen 14 áreas protegidas que se verán afectadas
Health ImpactsVisible: Mental problems including stress, depression and suicide, Other Health impacts
OtherIntimidaciones mediante la toma de fotografías durante las manifestantes
Socio-economic ImpactsVisible: Increase in violence and crime, Loss of livelihood, Loss of traditional knowledge/practices/cultures, Militarization and increased police presence, Loss of landscape/sense of place, Other socio-economic impacts
OtherEl Río Patuca es utilizado como medio de transporte y la disminución del caudal afectará esta tradición.
Outcome
Project StatusUnder construction
Pathways for conflict outcome / responseStrengthening of participation
Indemnizaciones parciales a los propietarios de las tierras que serán inundadas
Do you consider this as a success?No
Why? Explain briefly.A pesar de la oposición de los pueblos indígenas y de las comunidades afectadas, en el 2014 se reanudó la construcción de la segunda y última etapa del embalse de Patuca III. Incluso se piensa pedir la inclusión de la represa en mecanismos de "créditos de carbono".

El conflicto tomó un giro y más allá de la construcción o no del PH hay un conflicto por el retraso en el pago de las indemnizaciones a los propietarios de las tierras que serán afectadas por la inundación.
Sources and Materials
Legislations

Ley Especial Reguladora de Proyectos Públicos de Energía Renovable (Decreto No. 279-2010)

Ley Especial Reguladora de Proyectos Públicos de Energía Renovable (Decreto No. 279-2010)
[click to view]

Convenio 169 de la OIT
[click to view]

References

AF Industry AB; Ecología y Servicios S.A (2012). Estudios Ambientales y Sociales adicionales Patuca 3, Honduras
[click to view]

Artículo de OFRAHEH
[click to view]

Links

La Prensa. En febrero de 2014 reanudaron obras de represa Patuca III:
[click to view]

Página oficial Empresa Nacional de Energía Eléctrica (ENE). Proyecto Hidroeléctrico Patuca III.
[click to view]

Cultural and Survival (2001).Honduras: Don´t Dam the Patuca River! :
[click to view]

Honduras: Miskitu Facing Dams and Deforestation Granted Land Rights:
[click to view]

El Heraldo. Honduras: Patuca III en etapa crítica por falta de indemnizaciones:
[click to view]

Afectados por Patuca III se toman plantel principal del proyecto:
[click to view]

Media Links

Los Reporteros: Patuca III, sueño inconcluso
[click to view]

Declaraciones de Lorenzo Tinglass, presidente de la Federación indígenas Tawahka (FITH) sobre represa Patuca:
[click to view]

Lista de imágenes avance del PH Patuca III
[click to view]

Other Documents

Manta contra PH Patuca III Ríos para la vida no la para la Muerte

Fuente: http://www.moskitiaenpeligro.blogspot.com.br/
[click to view]

Meta Information
ContributorGrettel Navas
Last update16/07/2014