Proyecto Hidroeléctrico Changuinola II, Bocas del Toro, Panamá

Description

El Proyecto Hidroeléctrico Changuinola II se localiza aguas arriba del PH Changuinola I en cuatro comunidades habitadas por indígenas del pueblo Ngabe Buglé.

See more...
Basic Data
NameProyecto Hidroeléctrico Changuinola II, Bocas del Toro, Panamá
CountryPanama
ProvinceBocas del Toro
SiteCharco la Pava, Valle del Rey, Valle de Riscó , La Ceiba.
Accuracy of LocationHIGH local level
Source of Conflict
Type of Conflict (1st level)Water Management
Type of Conflict (2nd level)Dams and water distribution conflicts
Land acquisition conflicts
Water access rights and entitlements
Specific CommoditiesLand
Electricity
Water
Project Details and Actors
Project DetailsUbicación: cuenca rio Changuinola

-Capacidad instalada: 213 megavatios.

-Se construirá una represa para almacenar agua por 90 días

-Requiere de la construcción de una carretera de 15 kilómetros para accesar al PH Chan II, con 2 carriles, incluyendo su sistema de drenaje, estructuras para el cruce sobre ríos y/o quebradas, entre otros elementos viales, y cuyas dimensiones se desconocen.

- Estructura para el desvío del Río Changuinola

-Una casa de máquinas que incluirá, entre otros equipos, al menos dos unidades turbogeneradoras que tengan capacidad para generar como mínimo 200 MW, y proveer una generación anual promedio de al menos 1,000 GWh.

-Un conjunto compuesto por línea de transmisión y subestación(es) para la conexión del Proyecto Hidroeléctrico al Sistema Interconectado Nacional (SIN), administrado por ETESA, que permita el despacho de la energía generada por el Proyecto

-Corresponde al 9% de la capacidad instalada de Panamá.

Project Area (in hectares)77
Level of Investment (in USD)1,100,000,000.00
Type of PopulationRural
Potential Affected Population150,000 - 200,000
Start Date05/01/2007
Company Names or State EnterprisesEmpresa de Generación Eléctrica, S.A. (EGESA ) from Panama
Odebrecht Energy Luxembourg (Odebrecht) from Brazil
Sociedad Changuinola II, S.A from Panama
Relevant government actorsAutoridad Nacional del Ambiente (ANAM), Ministerio de Desarrollo Social (MDS), la Defensoría del Pueblo, la Autoridad Nacional de Servicios Públicos (ANSP), Autoridad Nacional del Ambiente (ANA)
Environmental justice organisations and other supportersCoordinadora de Defensa de los Recursos Naturales del Pueblo Ngäbe Buglé, Cultural Survivor.
The Conflict and the Mobilization
Intensity of Conflict (at highest level)MEDIUM (street protests, visible mobilization)
When did the mobilization beginPREVENTIVE resistance (precautionary phase)
Groups MobilizingIndigenous groups or traditional communities
International ejos
Local ejos
Neighbours/citizens/communities
Social movements
Women
Ethnically/racially discriminated groups
Forms of MobilizationArtistic and creative actions (eg guerilla theatre, murals)
Involvement of national and international NGOs
Objections to the EIA
Official complaint letters and petitions
Public campaigns
Street protest/marches
Arguments for the rights of mother nature
Impacts
Environmental ImpactsVisible: Noise pollution, Floods (river, coastal, mudflow), Food insecurity (crop damage), Loss of landscape/aesthetic degradation, Waste overflow, Deforestation and loss of vegetation cover, Surface water pollution / Decreasing water (physico-chemical, biological) quality, Large-scale disturbance of hydro and geological systems, Reduced ecological / hydrological connectivity
Health ImpactsVisible: Other Health impacts
OtherDebido al polvo generado por la maquinaria de construcción, varios niños y niñas comenzaron a sufrir de frecuentes e intensas enfermedades respiratorias.
Socio-economic ImpactsVisible: Increase in Corruption/Co-optation of different actors, Displacement, Lack of work security, labour absenteeism, firings, unemployment, Loss of livelihood, Loss of traditional knowledge/practices/cultures, Militarization and increased police presence, Specific impacts on women, Violations of human rights, Land dispossession, Loss of landscape/sense of place
Potential: Increase in violence and crime
Outcome
Project StatusPlanned (decision to go ahead eg EIA undertaken, etc)
Pathways for conflict outcome / responseRepression
Strengthening of participation
Under negotiation
Application of existing regulations
Development of AlternativesEl cese de concesiones para proyectos hidroeléctricos en la cuenca del Río Changuinola hasta no estar delimitadas las comarcas indígenas e identificadas las tierras anexas con posible afectación.
Do you consider this as a success?No
Why? Explain briefly.El proyecto comenzará a construirse en el 2014 sin realizar la consulta libre, previa e informada como lo indica la legislación internacional indígena. El antecedente ocurridos con la construcción de Changuinola I pueden repetirse.
Sources and Materials
Legislations

Tribunal Latinoamericano del Agua. Construcción de Embalses en los ríos Bonyic-Teribe y Changuinola en el Bosque Protector Palo Seco. Changuinola, Provincia de Bocas del Toro, República de Panamá.
[click to view]

Convenio 169, OIT
[click to view]

References

Cordero, S. ; Montenegro, R. ; Mafla, M. ; Burgués, I. ; Reid, J. (2006) Análisis costo beneficio de cuatro proyectos hidroeléctricos en la cuenca Changuinola-Teribe.
[click to view]

EGESA (2013). Licitación pública para la construcción de CHAN II.
[click to view]

Links

La Prensa (2014), Odebrecht haría Chan II:
[click to view]

La Prensa (2014), Chan II costará $1,049 millones:
[click to view]

Revista Suma (2013), Grupo indígena panameño se oponen a construcción de represa Chan II.
[click to view]

Propuesta Coordinadora Indígenas Ngabe Buglé
[click to view]

Resumen ejecutivo CHAN-140. Autoridad Nacional Ambiental (ANAM)
[click to view]

Media Links

Análisis espacial. Sobrevuelo al Proyecto Chan II - EGESA
[click to view]

Other Documents

Mujeres Ngobe Buglé, Panamá
[click to view]

Protestas de la red Afectados por Represas Hidroelectricas y en Defensa de los Rios de Panamá Fuente: http://www.gritodelosexcluidos.org/article/comunicado-de-la-red-de-afectados-por-represas-hid/
[click to view]

Meta Information
ContributorGrettel Navas, Fundación Neotrópica
Last update16/09/2014
Comments