Hydroelectric Project Caculo Cabaça, Angola


Description

The hydroelectric project Caculo-Cabaça is located in São Pedro da Quilemba, 74 km from Dondo, Cuanza Norte. Financed by China, it is planned to generate 2,172 MW for allegedly allow access to electricity from 30% to 60% of the national population. The construction of the plant started in August 2017 and will continue for the next 5 years approximately.  The project was cleared in 2015 and got financing from the Chinese state bank ICBC, who posed the condition that it would be the Chinese consortium CGGC that would build it. According to an article in Spiegel, El Mundo and other sources, the daughter of the current Angolan president, Isabel dos Santos, has a high share in the consortium, which ensures revenues for the ruling family as well. [1] [4]. The construction at Caculo-Cabaça started the same month of the inauguration of the 2070 MW Lauca HEP along the same river, in the Malanje province. The two plants are second in Africa only to the Grand Ethiopian Renaissance Dam (6,000MW).  The government plans in fact is to invest an important amount of resources in hydropower, included in the "Programa de Investimento Público", in order to achieve the goal of 9,000 installed MW potential by 2025. Access to clean electricity and generation of jobs are the two main arguments for big plants, but electricity is also planned to be exported to Namibia and South Africa along an interconnected grid. According to the World Energy Council, "Angola’s estimated hydropower potential is 150 TWh/yr, one of the highest in Africa. However, so far only a small fraction of the country’s hydro potential has been harnessed. Feasibility Studies are in progress on major hydro schemes at Lauca and Caculo-Cabaca on the Kwanza river, each with an installed capacity of 2 000 MW, and on a 300 MW bi-national project at Baynes Mountain on the Cunene".[2]       According to a study by EXAME, Angola will soon have an installed capacity of 7,000 MW from its hydro sources. Together with the capacity of other plants such as Thermal plants (2,000MW), the Combined Cycle Gas Turbine of Soyo (750MW), and the wind mill in Tombwa (100MW), the country will count on around 10,000MW installed capacity [3].

For the time being, there is very little resistance to such projects in Angola because of the restrictions on organizing by the government.

Basic Data

NameHydroelectric Project Caculo Cabaça, Angola
CountryAngola
SiteDondo
Accuracy of LocationMEDIUM regional level

Source of Conflict

Type of Conflict (1st level)Water Management
Type of Conflict (2nd level)Dams and water distribution conflicts
Specific CommoditiesLand
Electricity
Water

Project Details and Actors

Project DetailsThe plant will have 2,172 MW installed. One part of this might be allocated to domestic consumption but also for export to South Africa and possibly to aluminium smelting (following the steps of Mozambique). A MOU was signed with Alcoa in 2009.
Level of Investment (in USD)4,500,000,000 [2]
Type of PopulationRural
Company Names or State EnterprisesChina Gezhouba Group Co., Ltd (CGGC) from China
Relevant government actorsPresident of the Republic

Ministry of Energy
International and Financial InstitutionsIndustrial and Commercial Bank of China Limited (ICBC) from China

The Conflict and the Mobilization

Intensity of Conflict (at highest level)LATENT (no visible organising at the moment)
When did the mobilization beginUNKNOWN

Impacts

Environmental ImpactsPotential: Biodiversity loss (wildlife, agro-diversity), Floods (river, coastal, mudflow), Food insecurity (crop damage), Soil contamination, Deforestation and loss of vegetation cover, Surface water pollution / Decreasing water (physico-chemical, biological) quality, Groundwater pollution or depletion
Health ImpactsPotential: Malnutrition, Infectious diseases
Socio-economic ImpactsPotential: Displacement, Loss of traditional knowledge/practices/cultures, Specific impacts on women, Loss of landscape/sense of place

Outcome

Project StatusUnder construction
Pathways for conflict outcome / responseCorruption
Do you consider this as a success?Not Sure
Why? Explain briefly.There is very little resistance to such projects in Angola because of the restrictions on organizing by the government. For the time being, the case can be considered a latent conflict, as the impacts will be for sure significant.

Sources and Materials

Links

[3] EXAME Angola - ENERGIA: As barragens do futuro
http://www.portaldeangola.com/2013/04/energia-as-barragens-do-futuro/

[2] Compañía china construirá central hidroeléctrica masiva en Angola
https://www.debate.com.mx/mundo/Compania-china-construira-central-hidroelectrica-masiva-en-Angola--20170804-0430.html

[2] World Resource Institute - Angola
https://www.worldenergy.org/data/resources/country/angola/hydropower/

VOA - Chefe de Estado lança primeira pedra da barragem de Caculo Cabaça
https://www.voaportugues.com/a/angola-chefe-estado-lanca-primeira-pedra-barragem-caculo-cabaca/3972042.html

[1] El Mundo - ANGOLA

El último regalo del presidente Dos Santos a su hija: una presa de 4.500 millones de dólares
http://www.elmundo.es/internacional/2017/08/27/59a0598446163fe52d8b4626.html

As Barragens Hidroeléctricas e o Futuro Energético de Angola
http://angolapowerservices.blogspot.com.es/2013/05/as-barragens-hidroelectricas-e-o-futuro.html

[4]Des révélations accablantes de Mediapart sur Isabel dos Santos
http://www.politico.cd/actualite/la-une/2017/09/07/revelations-accablantes-de-mediapart-isabel-santos.html

Media Links

New China TV - Chinese firm contracted to build massive hydropower plant in Angola
https://www.youtube.com/watch?v=GnHV5DjywsE

Micael Pereira (for Expresso, Portugal). Angola: where a father's gift to his daughter is a multi-billion dollar dam contract. EIC 2016 / 2017-08-26. Isabel dos Santos, daughter of Angolan president José Eduardo dos Santos, has won a massive part of a 4.5 billion USD contract to construct a dam in her own country. She used a proxy company registered in Hong Kong to secure the deal approved by her own father, reveals a leak obtained by Der Spiegel and shared with the European Investigative Collaborations (EIC) network.
https://theblacksea.eu/index.php?idT=88&idC=88&idRec=1328&recType=story

Other Documents

https://file.ejatlas.org/docs/Angola_map_hidroelectricas.jpg

Presidente da República colocou a primeira pedra da obra Fotografia: Nelo Mateus |Edições Novembro - Cuanza-Norte

Source: http://jornaldeangola.sapo.ao/politica/lancada_a_barragem_de_caculo_cabaca
https://file.ejatlas.org/docs/Angola_Caculo.jpg

Meta Information

ContributorDaniela Del Bene, ENVJUSTICE project
Last update24/09/2017

Images

 

 

Presidente da República colocou a primeira pedra da obra

Fotografia: Nelo Mateus |Edições Novembro - Cuanza-Norte Source: http://jornaldeangola.sapo.ao/politica/lancada_a_barragem_de_caculo_cabaca