Borj Chakir Landfill, Tunisia


Description

The Jbel Borj Chakir dumpsite was created in 1999 and is considered to be the only controlled dumpsite for Tunis and the surrounding area. It spreads out on an area of around120 hectares which previously contained olive, almond and cereal plantations. Every day, the landfill receives between 2700 and 3000 Tons of waste [1]. The post-revolution decision to centralize waste management has exacerbated what was already an urgent problem [2].

For most of its lifetime, the dumpsite was managed by waste-pickers and municipalities. But facing discontent at the increase in rubbish on the streets, fields and beaches, centralized policies were adopted by the ministry of environment in the hope of a more efficient waste collection and management.

According to SOS BIAA, an NGO which based in Tunis, Tunisia, founded in the summer of 2011 following the Tunisian revolution and regrouping engineers, scientists, lawyers, doctors and veterinaries [4], this policy lead to Borj Chakir taking most of the municipal solid waste of the Greater Tunis area [2].

On March 1, 2009, the Borj Chakir landfill became jointly operated by the Municipal Agency for Environmental Services (AMSE) and a French group called PIZZORINO Environment (GPE). And on the 9th of June, 20011, the National Commission of Investigation on Corruption and Embezzlement (CICM) filed a complaint against GPE, accusing it of illegally securing the Waste Management of Greater Tunis. Their contract was terminated in 2013 [3].

ECOTI, a Tunisian-Italian company won the following tender and has since been managing the landfill. The company is a joint venture between DECO Group from Italy and SOCOBAT from Tunisia. The Italian company was also accused of corruption and embezzlement in Pescara, Italy [3].

The World Bank supported the landfill for more than two decades, and its loans were the only source of government funding for the Borj Chakir landfill. A plan for a partnership between the bank and the Tunisian National Agency for the Management of Waste (ANGED) for a de-gassing and toxin removal project, was brought to an abrupt end because of political turmoil. The project was revived in 2014, with a loan of $22 million to expand the landfill [2].

On April 4, 2015, the Minister of Environment and Sustainable Developmenr, Nejib Derouiche, announced his intentions of expanding the landfill and disregarding the claims and the demands of the inhabitants of the nearby villages. The CEO of ANGED also stated that he’ll be looking to empty the leachate basins, reconstructing the landfill wall, and planting odor-absorbing trees in the surrounding areas. Protesters, affected by the landfill claimed that the whole waste management sector needs to be reformed and that technical adjustments won’t change much [5].

Initially, Jbel Borj Chakir was supposed to close in the summer of 2013, when it was projected to reach full capacity. But residents of Kabouti, where plans for a new landfills were made, halted the construction and made it clear that they refuse to see a landfill built near their community [9].

    Throughout the process, activists and inhabitants of the nearby villages held many marches and protests to decry the dire conditions in which they are living because of the landfill [6][7]. Moreover, SOS BIAA published multiple reports about the environmental and health damage the landfill is causing. On an environmental level, the report claims that large amounts of leachate have infiltrated the ground and contaminated the groundwater in the area within a radius of about 5 km of the landfill and that, as a result, several wells were contaminated. On the health level, they claim that skin and respiratory diseases have appeared. Diseases which are consistent with previous studies made about landfills [8]. Most of the people affected are workers on the site and the poor communities living in its vicinity [10]. Residents of Borj Chakir and surrounding villages have tried taking steps to force government officials to take steps to reduce pollution since the end of the revolution. They held discussions with municipal and local representatives but their efforts were poorly organized and remained without any tangible results. They were also never able to reach higher ranking government officials.

SOS BIAA have set the following demands which are still awaiting execution [8]: ·       The establishment of a clearly defined action plan to make the landfill conform to international standards ·       The establishment of a new waste management strategy that will minimize the amount of waste sent to landfills ·       The establishment of a timeline to get all the leachate on site treated and the ponds emptied in a short period of time.

·       Consider quick ways to find another site to build a new landfill.

Basic Data

NameBorj Chakir Landfill, Tunisia
CountryTunisia
ProvinceTunis Governorate
SiteBorj Chakir
Accuracy of LocationHIGH local level

Source of Conflict

Type of Conflict (1st level)Waste Management
Type of Conflict (2nd level)Landfills, toxic waste treatment, uncontrolled dump sites
Specific CommoditiesIndustrial waste
Domestic municipal waste

Project Details and Actors

Project DetailsThis landfill was built in 1999 over an area of approximately 120 hectares. This is by far the largest landfill in Tunisia with a capacity of over 3,000 tons /day. This number could reach 4000 tons/day during the cleanliness campaigns. Jbel Borj Chakir is the only landfill in the Greater Tunis (governorates of Tunis, Manouba, Ariana and Ben Arous), for a population of over 3,000,000 inhabitants [8].
Project Area (in hectares)120
Level of Investment (in USD)22,000,000.00
Type of PopulationSemi-urban
Potential Affected Population50,000
Start Date2011
Company Names or State EnterprisesAgence Nationale de Gestion des Déchets (ANGED) from Tunisia - Landfill Management
Agence Municipale des Services Environnementaux (AMSE) from Tunisia - Co-managed the landfill with Groupe PIZZORINO Environnement between 2009 and 2013
Groupe PIZZORINO Environnement (GPE) from France - Co-managed the Landfill with AMSE between 2009 and 2013
Société de Construction et de Bâtiment (SOCOBAT) from Tunisia - Co-managing the landfill along with DECO Group from Italy since 2013
DECO Group from Italy - Co-Managing the landfill with SOBACO since 2013
Relevant government actorsMinistry of Agriculture and the Environment (Now Ministry of the Environment and Sustainable Development)

National Commission of Investigation on Corruption and Embezzlement (CICM)
International and Financial InstitutionsThe World Bank (WB) from United States of America
Environmental justice organisations and other supportersSOS BIAA: http://www.sosbiaa.com/EN/index.php?id_page=index.php

The Conflict and the Mobilization

Intensity of Conflict (at highest level)LOW (some local organising)
When did the mobilization beginIn REACTION to the implementation (during construction or operation)
Groups MobilizingLocal ejos
Neighbours/citizens/communities
Local scientists/professionals
Forms of MobilizationCreation of alternative reports/knowledge
Involvement of national and international NGOs
Public campaigns
Street protest/marches

Impacts

Environmental ImpactsVisible: Soil contamination, Groundwater pollution or depletion, Air pollution, Waste overflow
Health ImpactsVisible: Other Health impacts, Exposure to unknown or uncertain complex risks (radiation, etc…)
OtherAllergies, Asthma, Respiratory Diseases
Socio-economic ImpactsVisible: Increase in Corruption/Co-optation of different actors

Outcome

Project StatusIn operation
Pathways for conflict outcome / responseCorruption
Development of AlternativesSOS BIAA have set the following demands which are still awaiting execution [8]:

· The establishment of a clearly defined action plan to make the landfill conform to international standards

· The establishment of a new waste management strategy that will minimize the amount of waste sent to landfills

· The establishment of a timeline to get all the leachate on site treated and the ponds emptied in a short period of time.

· Consider quick ways to find another site to build a new landfill.
Do you consider this as a success?No
Why? Explain briefly.Officials are still wasting time on the issue. And with the expansion of the landfill giving it a new lease of life until 2019, no alternative plans are being assessed.

Sources and Materials

Legislations

DECHARGES CONTROLEES ET CENTRES DE TRANSFERT: CAHIERS DE CHARGES ET CALCUL COUTS D'EXPLOITATION
http://nawaat.org/portail/wp-content/uploads/2015/05/BChekir.pdf

Sustainable Municipal Solid Waste Management Project - World Bank
http://documents.worldbank.org/curated/en/784931468166165390/pdf/ICR32710P095010C0disclosed020190150.pdf

References

[8] - SOS BIAA's Report
http://www.sosbiaa.com/EN/project_landfill_chakir.php?id_page=project_landfill_chakir.php

Links

[1] - La décharge de Borj Chakir : Mirage de la « vie décente pour tous » - Nawat, 31/03/15
http://nawaat.org/portail/2015/03/31/la-decharge-de-borj-chakir-mirage-de-la-vie-decente-pour-tous/

[2] - World Bank Funds Tunisian Rubbish Dump Which Leaves Village Sick - Middle East Eye, 07/05/17
http://www.middleeasteye.net/news/world-bank-funds-tunisian-rubbish-dump-which-leaves-village-sick-1293932759

[9] - Landfill Continues to Pollute Nearly Three Years After Intended Closing - TunisiaLive, 17/01/16
http://www.tunisia-live.net/2016/01/17/landfill-continues-to-pollute-town-nearly-three-years-after-intended-closing/

[10] - Tunisia's poorest towns left to shoulder burden of hazardous toxic landfill sites - The Guardian, 13/05/14
https://www.theguardian.com/global-development/2014/may/13/tunisia-poorest-towns-hazardous-toxic-landfill-sites

[3] - Decharge de Borj Chakir : Corruption endémique et cadres institutionnels inadéquats - Nawat, 15/05/15
http://nawaat.org/portail/2015/05/15/decharge-de-borj-chakir-corruption-cadre-institutionnel-inadequat/

[4] - SOS BIAA's website
http://www.sosbiaa.com/EN/index.php?id_page=index.php

[5] - La décharge de Borj Chakir : un cataclysme écologique en cours - Nawat, 13/04/15
http://nawaat.org/portail/2015/04/13/la-decharge-de-borj-chakir-un-cataclysme-ecologique-en-cours/

Media Links

[6] - Protest against the Landfill (1)
https://www.youtube.com/watch?v=nayrCX7iNlo

[7] - Protest against the Landfill (2)
https://www.youtube.com/watch?v=ITHQQh_s6fo

Other Documents

A digger crawls over the mountain of waste at Borj Chakir (Morched Garbouj/SOS BIAA)
https://file.ejatlas.org/docs/landfill_Morched_Garbouj_SOS_BIAA.jpg

Trucks in Borj Chakir deliver waste to one of the biggest landfills in Tunisia (Morched Garbouj/SOS BIAA)
https://file.ejatlas.org/docs/Morched_Garbouj_SOS_BIAA.jpg

Meta Information

ContributorChristophe Maroun - ICTA
Last update12/05/2017