Kangaluwi Copper Mine in the Lower Zambezi National Park, Zambia


Description:

 In June 2021 the Zambian government has given the green light  to  the proposal for an open pit copper mine – the Kangaluwi project - in the heart of the Lower Zambezi National Park. The project could set an important precedent for the future development of its mining sector; that of mining activity within protected areas [1]. The proposed mine is the first in Zambia which involves a foreign-owned company, Zambezi Resources Limited,  to develop a large-scale mining project inside Zambias national park. In 2003, the Australia-based company Zambezi Resources Ltd  was granted an exploration licence of 240sqkm in the Lower Zambezi National Park and established a subsidiary company, Mwembeshi Resources Ltd registered in Bermuda. 

Already in 2010, 17 chieftains of the surrounding region signed an agreement to oppose all mining in the Lower Zambezi National Park [2]. However, in 2011 the company was granted a 25-year mining licence and began to prospect for copper. In March 2012, Mwembeshi Resources Limited submitted an Environmental Impact Statement (EIS) which was rejected by the Zambian Wildlife Agency in September 2012. The authorities claim that “the proposed site is not suitable for the nature of the project because it is located in the middle of a national park and thus intends to compromise the ecological value of the park as well as the ecosystem” [5]. According to the 1998 Zambian Wildlife Act, mining is allowed within National Parks, and protected areas in general, if an Environmental Impact Assessment is undertaken [13]. 

In January 2014, the Minister of Lands, Natural Resources and Environmental Protection overturned the decision of the Zambian Envrionmental Management Authority (ZEMA) and granted full permission for the Kangaluwi copper mine. The same year, a Dr. Kelly Leigh published an extensive report  which analyses the EIS put forward by the company together with likely economic, and biodiversity impacts as well as impacts on local communities and consolidates available information on the projects [1]. The key findings are the following: first, it laments a flawed documentation by Zambezi Resources Limited process, with dubious Environmental Impact Statement data, and neglection of community and stakeholder concerns. Second, modelling figures suggest the project is not economically viable and that the EIS failed to assess the full scope and risks of economic impacts, temporally and spatially beyond the mine’s life span [1][14]. For example, the EIS fails to acknowledge the negative impacts on the tourism industry in the park and the loss of foreign aid investment or to take into account costs and impacts of building new roads inside the park. Third, it does not acknowledge long-term risk of damage to ecological and hydrological connectivity of the area. Lastly, it highlights through the company’s track record a questionable management capacity and commitment to any form of Corporate Social Responsibility [1].

The minister’s decision to allow mining in the Lower Zambezi prompted a legal case put forward in February 2014 by David Dgwenya and representatives of 5 different Zambian environmental and conservation NGOs. They appealed to Zambia’s High Court to reverse the minister’s decision. The court granted a temporary injunction to halt the mine as long as the court case is pending [6]. Between 2015 and 2019 the court case stagnated and after the death of the presiding judge, a new judge was appointed, tasked with clearing backlogged cases [3]. Under the newly appointed judge, the case was dismissed because of the appellants' failure to file a Record of Appeal. Thus, the case was closed on October 17th, 2019, over a legal technicality, rather than considering the full environmental impacts of the mine [12]. In 2021, the same coalition led by David Ngwenyama and 5 NGOs  attempted to overturn the High Court ruling through the Court of Appeals. However, the court of appeals upheld the High Court’s ruling, effectively ending all legal remedies for the case [3][16].

Another important development was brought by the Mines and Mineral Development Minister Patrick Musukwa on the 5th of January 2020. Despite gaining green light on the mining project through the High Court judgement, Patrick Musukwa claimed before the Parliament that the mining license was invalid. In his parliamentary statement, he claimed that according to the Environmental Management Act a mining company is required to commence implementation of a project within three years from the date of approval [11]. As Mwembeshi Resources Limited had failed to do so, the license had effectively expired in February 2017. This would have meant for the company to conduct a new environmental and social impact assessment and re-apply for mining rights. However, Zambia’s Environmental Management Authority granted an extension of the Decision Letter and thus the EIS, granting an extension to the companies mining rights without requiring a new environmental impact assessment.

Besides the legal mobilization against the mine, the projects proposal together with the deeply flawed Environmental Impact Statement has led to response and resistance of various civil-society actors, politicians, and local as well as international NGOs. For example, both Zambia’s founding president Kenneth Kaunda, and former President Rupiah Banda openly expressed their opposition to the Kangaluwi copper mine and the damage it would do to the tourism industry and the country’s natural heritage [5]. Similarly, a youth organization called IMPI organized marches, petitions and held conferences to attract public attention to the court ruling of 2019. NGOs and community-based organizations involved in opposing the mine include Zambia’s Climate Change Network, Chalimbana River Head Waters Conservation Trust, and the Green Living Movement. A prominent role was played by Zambia’s Community Based Natural Resource Management Forum which in 2014 issued a press statement on behalf of over 100 environmental organizations in Zambia calling the approval of the copper mine a “national tragedy” [8]. Additionally, social media platforms were used to raise awareness and a petition, which by November 2021 had gained 35,000 signatures, addressed the incumbent president and pleaded for a suspension of the project [7][9]. Additionally, OXFAM Australia and Action provided support or whereas WWF and Conservation International raised the issue to international fora through public awareness campaigns [2][9][10].

The Project has also considerable relevance to downstream riparian countries of the Zambezi River namely Zimbabwe and Mozambique. The Kangaluwi mine’s location poses a significant threat to the integrity of the Mana Pools, a World Heritage Site 25 km downstream on the Zambezi River [14]. The EIS fails to propose serious mitigation of toxic substances flowing into the Mana Pools. However, considering that the area is prone to earthquakes additional safety provisions to the tailing’s storage facilities are necessary. Estimates claim that toxic spilling would threaten the lives of 20,000 people who mainly rely on the riparian system for subsistence [6]. Furthermore, an open-pit copper mine would invariably threaten the tourist economy in the region which employs 1,000 people in the area. It remains to be seen whether alternative legal remedies to stop the mine can be found, whether public campaigning will exert enough pressure on Zambia’s national politics or whether a new environmental and social impact assessment will be necessary to continue with the project.

Basic Data

Name of conflict:Kangaluwi Copper Mine in the Lower Zambezi National Park, Zambia
Country:Zambia
State or province:Lusaka Province
Accuracy of locationHIGH (Local level)

Source of Conflict

Type of conflict. 1st level:Mineral Ores and Building Materials Extraction
Type of conflict. 2nd level:Mining exploration and/or ore extraction
Establishment of reserves/national parks
Specific commodities:Copper

Project Details and Actors

Project details

The Kangaluwi Project is surrounded by ambiguities regarding its technical details. First of all, the Environmental Impact Statement submitted by Zambezi Resources Ltd refers to four different pits. The main pit at Kangaluwi, and three satellite pits at Kalulu, Chisawa, and Imboo. The EIS provides inconsistent estimates for the mine’s life expectancy, ranging from 3-4 years, 8 years, 20 years, or up to 25 years, sometimes referring to only one pit, multiple, or up to all 4 pits. Furthermore, the EIS failed to include the scope of the whole project as it does not include any resource statements, mine plans, considerations of tailings, waste rocks, or the additional infrastructure necessary to operate the mine and connect the pits such as roads[1][14]. This leads to a grave understatement of the economic and environmental impacts of the mine [1].

The production rates for years 4-8 are estimated at 3Mt of copper concentrate at 28% = 840,000 tons of copper per year. This is more than all current copper operations in Zambia combined and would greatly overextend the country’s smelter capacity. In case the Kangaluwi project would have to build a smelter inside the National Park to make the mine economically viable, it would mean an additional USD $1.5 billion, consume at least 150MW of power and greatly increase its environmental footprint. However, the report goes on to claim that 840,000 tones per year are completely unfounded and a great overstatement by Zambezi Resources Limited. Similarly, the cost estimate of USD $494,600,000 is unrealistic according to independent mining experts [1].

Project area:24,500
Level of Investment for the conflictive project494,600,000 [1]
Type of populationRural
Affected Population:20,000-30,000 [7]
Start of the conflict:16/03/2011
Company names or state enterprises:Zambezi Resources Limited from Australia
Mwembeshi Resources Limited from Bermuda
Relevant government actors:Zambian Wildlife Authority
Zambian Environmental Management Agency
Ministry of Lands, Natural Resources and Environmental Protection
Environmental justice organizations (and other supporters) and their websites, if available:Zambia Community Based Natural Resource Management Forum
Zambian Institute of Environment Mangement
Zambia Climate Change Network
Chalimbana River Head Waters Conservation Trust
Green Living Movement
WWF International
Conservation International
OXFAM Australia
Action Aid
IMPI Zambia

Conflict & Mobilization

IntensityMEDIUM (street protests, visible mobilization)
Reaction stagePREVENTIVE resistance (precautionary phase)
Groups mobilizing:Indigenous groups or traditional communities
International ejos
Local ejos
Local government/political parties
Neighbours/citizens/communities
Local scientists/professionals
Religious groups
Goba people
Forms of mobilization:Creation of alternative reports/knowledge
Lawsuits, court cases, judicial activism
Objections to the EIA
Official complaint letters and petitions
Street protest/marches

Impacts

Environmental ImpactsPotential: Biodiversity loss (wildlife, agro-diversity), Loss of landscape/aesthetic degradation, Noise pollution, Soil contamination, Soil erosion, Surface water pollution / Decreasing water (physico-chemical, biological) quality, Groundwater pollution or depletion, Large-scale disturbance of hydro and geological systems, Reduced ecological / hydrological connectivity, Mine tailing spills
Health ImpactsPotential: Occupational disease and accidents
Socio-economical ImpactsPotential: Violations of human rights, Increase in Corruption/Co-optation of different actors, Loss of landscape/sense of place, Displacement

Outcome

Project StatusPlanned (decision to go ahead eg EIA undertaken, etc)
Conflict outcome / response:Court decision (failure for environmental justice)
Proposal and development of alternatives:There are few alternatives since the go-ahead has been given by Zambia's High Court and its ruling upheld by the Court of Appeals.
If the pressure exerted by local, international NGOs and civil society organizations, together with politicians which have openly opposed the mine persists, there might be hope to re-open a legal case against the mine, or at least require a new and thorough environmental impact assessment.
Do you consider this an environmental justice success? Was environmental justice served?:No
Briefly explain:Despite the long legal battle against Mwembeshi Resources Limited spearheaded by David Ngwenyama and 5 NGOs, it seems that since June 2021 the company has received the green light to continue with the project through an extension of the validity of the Environmental Impact Assessment. According to one source, David Ngwenyama has reached out to the Zambian Envrionmental Management Authority to negotiate with the company a proposal for biodiversity offsets and a program for environmental and social monitoring if the mine should proceed as planned [2].

Sources & Materials

Juridical relevant texts related to the conflict (laws, legislations, EIAs, etc)

[11] Musukwa P. (2020) Ministerial Statement on Status of Kangaluwi Copper Project in Lowe Zambezi National Park by the Hon. Minister of Mines and Minerals Development Musukwa, MP
https://www.parliament.gov.zm/sites/default/files/images/publication_docs/Ministerial%20Statement%20on%20the%20status%20of%20Kangaluwi%20Copper%20Project%20in%20Lower%20Zambezi%20National%20Park.pdf

[12] High Court of Zambia (2019) Vincent Ziba and Ohers v. Attorney General and Mwembeshi Resources Limited. October 17th 2019
https://africageographic.com/wp-content/uploads/2019/10/085513.pdf

[13] Zambia Wildlife Act (1998)
https://www.zambialaws.com/1998/zambia-wildlife-act

[15] Zambia Wildlife Act (2015)
https://www.parliament.gov.zm/sites/default/files/documents/acts/The%20%20Zambia%20Wildlife%20Act%2C%202015.pdf

[16] Court of Appeal (2021) David Ngwenyama v Attorney General and Mwembeshi Resources Limited
https://zambialii.org/zm/judgment/court-appeal-zambia/2021/15

References to published books, academic articles, movies or published documentaries

[1] Leigh K. (2014) Evaluation Report: Kangaluwi open-pit copper mine in the Lower Zambezi National Park.
https://www.academia.edu/17072179/Evaluation_Report_Kangaluwi_Open-pit_Copper_Mine_in_the_Lower_Zambezi_National_Park_Zambia

[9] Mukwakwa, N. (2020). Conflict between mining project and environmental protection: analyzing NGOs’ legal mobilisation against of mining in the Lower Zambezi National Park. Masters Dissertation
https://thesis.eur.nl/pub/56224/

[2] Africa Geographic (2021). Lower Zambezi copper mine given the go-ahead. AfricaGeographic.com June 23rd 2021
https://africageographic.com/stories/copper-mine-in-lower-zambezi-np-given-the-go-ahead/

[3] Nkala, O. (2021). Copper mine threatens Zambezi national park. Oxpeckers.com June 23rd 2021
https://oxpeckers.org/2021/06/copper-mine-threatens-zambezi/

[4] Steyn, P. (2014). Lower Zambezi National Park Mining Project is "Fatally Flawed" says Report. ZimbabweSituation.com December 11th 2014
https://www.zimbabwesituation.com/news/lower-zambezi-national-park-mining-project-fatally-flawed-says-report/

[5] Lusaka Times (2019). RB joins KK in opposing Mining in the Zambezi National Park. LusakaTimes.com November 1st 2019
https://www.lusakatimes.com/2019/11/01/rb-joins-kk-in-opposing-mining-in-the-zambezi-national-park/

[6] LusakaTimes (2021). Lower Zambezi Large Scale Mine Project to go ahead after Appeal is dismissed. Lusakatimes.com February 28th 2021
https://www.lusakatimes.com/2021/02/28/lower-zambezi-large-scale-mine-project-to-go-ahead-after-appeal-is-dismissed/

[7] Petition (n.d.). Save Zambezi, Safe Zambezi. change.org
www.change.org/p/president-hakainde-hichilema-save-zambezi-safe-zambezi-people-water-land-and-wildlife?recruiter=1195715532&recruited_by_id=e1ed1ef0-a1dd-11eb-a588-a9514d6d3357&utm_source=share_petition&utm_medium=copylink&utm_campaign=petition_dashboard

[10] WWF Zambia (2019). WWF Zambia Response to the High Court Ruling on Mining in the Lower Zambezi National Park. October 28th 2019
https://www.wwfzm.panda.org/?30041/WWF-Zambia-Response-to-the-High-Court-Ruling-on-Mining-in-the-Lower-Zambezi-National-Park

Other documents

[8] Zambia CBNRMF (2014) Press Statement
https://file.ejatlas.org/docs/5659/CBNRMF_2014_Lower_Zambezi_Mining_Press_Release.pdf

[14] Zambia CBNRMF (n.d.) Policy Advisory Note on the Proposed Kangaluwe large scale copper mining project
https://file.ejatlas.org/docs/5659/CBNRM_Forum__xxxx__Lower_Zambezi_Mining_Briefing.pdf

Meta information

Contributor:Pietro Venturi, [email protected]
Last update05/01/2022
Conflict ID:5659

Images

 

Zambezi Resources Limited Topographical Map of Game Management Area

https://www.dailymaverick.co.za/article/2019-10-10-judgment-day-for-controversial-mining-deal-in-the-lower-zambezi-national-park/

Zambezi Resources Limited Proposed Mine Site Layout

https://www.dailymaverick.co.za/article/2019-10-10-judgment-day-for-controversial-mining-deal-in-the-lower-zambezi-national-park/

Protesting the Mine

https://africageographic.com/stories/copper-mine-in-lower-zambezi-np-given-the-go-ahead/

Lower Zambezi National Park

https://www.lifegate.com/zambia-cancels-kangaluwi-mine

Timeline of Key Events at kangaluwi mine

https://africageographic.com/stories/copper-mine-in-lower-zambezi-np-given-the-go-ahead/