Thermoelectric Complex Parnaíba, Maranhao, Brazil


Description:

The Thermoelectric Complex Parnaíba is located in the Maranhao State. This project is the largest natural gas-fueled thermoelectric power complex in Brazil and is made-up by four plants; together they reach 845 MW. The plants are synchronized with the Interconnected National System (SIN). The natural gas supplied to the plants of the Parnaíba Complex plants comes from the production wells in the Parnaíba Basin, and represents approximately 40% of the Brazilian onshore production.  This project was inaugurated in 2013. But it has being built since 2009 supported by different financial sources such as World Bank and Brazilian Development Bank (BNDES).  It is s a joint venture between MPX (ENEVA), OGX Maranhão and Petra Energia S.A. It was built by Duro Felguera (Spain).  In 2011, OGX Maranhão (ENEVA) receives the preliminary license for the Natural Gas Production in the Parnaíba Basin.  During the construction of the project, traditional communities (quilombolas and quebradeiras de coco babaçu) together with local and national organizations  (Sociedade Maranhense de Direitos Humanos (SMDH), Asociaçao de Mulheres Quebradeiras de Coco (AMUQUEC) and other EJOS put a demand for ask for compensation and denouncing damage in the environment , shortage of palms of coco babaçu (main activity of women along the forest), noise pollution,  pollution of rivers where fishermen used to fish, water scarcity and damage to their livelihoods.  According to the communities denouncing the facts, one person affected by noise and stress committed suicide. There also some supporters such as priesst and Asamblea de Deus organization. Beyond the judicial demand, some actions such as public demonstrations, damage to the company´s property and blockages were also deployed. In 2014, the court decided in favor of the local communities and forced the company (ENEVA) to resettle the affected families; "In a non-renewable period of 180 days. To be made effective resettlement, under appropriate conditions, all the families affected by the Parnaíba Thermoelectric Complex. The process must comply with the conditions stipulated in the resettlement plan approved by the SEMA, the environmental impact assessment and the agreement signed with the affected people." In 2015-2016 the company has begun the resettlements but the livelihoods of the communities have extremely changed and the pollution continues. 

Basic Data

Name of conflict:Thermoelectric Complex Parnaíba, Maranhao, Brazil
Country:Brazil
State or province:Maranhão
Location of conflict:Demanda, Santo Antonio dos Lopes
Accuracy of locationMEDIUM (Regional level)

Source of Conflict

Type of conflict. 1st level:Fossil Fuels and Climate Justice/Energy
Type of conflict. 2nd level:Deforestation
Oil and gas exploration and extraction
Thermal power plants
Specific commodities:Electricity
Natural Gas

Project Details and Actors

Project details

ENEVA reported in 2015 thatit operates one of the largest natural gas-fueled thermoelectric power generation complexes in Brazil, a pioneering project that integrates natural gas production to power generation. The Parnaíba Complex comprises the thermoelectric plants Parnaíba I, Parnaíba II, Parnaíba III and Parnaíba IV, which are installed in the municipality of Santo Antônio dos Lopes, in the state of Maranhão. The gas used as fuel for the plants is produced in the exploratory blocks of Parnaíba Gás Natural, in the Parnaíba Basin.

The plants Parnaíba I (676 MW), Parnaíba III (176 MW) and Parnaíba IV (56 MW) are currently in operation and supplying power to Brazil's National Interconnected System (SIN). When the operation of Parnaíba II is started (518 MW), the Parnaíba Complex will reach 1,425 MW in operation.

This project is in operation and supplying the Brazil's National Interconnected System (SIN).

Status: licensed capacity to reach eventually up to 3,722 MW

Generated jobs: 3,700 direct jobs at the peak of works

Level of Investment:230,000,000
Type of populationSemi-urban
Affected Population:14,200
Start of the conflict:05/2011
Company names or state enterprises:MPX Energia S.A (renamed ENEVA) (ENEVA) from Brazil - owner
Duro Felguera (DF) from Spain - CONSTRUCTION
ENEVA from Brazil
Relevant government actors:Ministery of Mines, Government of Brazil, Government of the State of Maranhnao, National Agency of Electric Energy (ANEEL), Secretaria de Estado de Meio Ambiente (SEMA),
International and Finance InstitutionsThe World Bank (WB) from United States of America
Banco Nacional de Desenvolvimento Econômico e Social (BNDES) from Brazil
Environmental justice organizations (and other supporters) and their websites, if available:Human Rights Society of Maranhao (SMDH), Pastoral Comission of Earth, Comisao Pastoral da Terra (CPT-MA), Cáritas, Landless Workers' Movement (MST), Quilombola Movement (MOQUIBOM), Human Rights Society of Maranhao (SMDH), Asociaçao de Mulheres Quebradeiras de Coco (AMUQUEC)

Conflict & Mobilization

IntensityMEDIUM (street protests, visible mobilization)
Reaction stageIn REACTION to the implementation (during construction or operation)
Groups mobilizing:Farmers
Indigenous groups or traditional communities
Informal workers
Local ejos
Social movements
Women
Religious groups
Forms of mobilization:Blockades
Development of a network/collective action
Lawsuits, court cases, judicial activism
Street protest/marches
Property damage/arson
Occupation of buildings/public spaces

Impacts

Environmental ImpactsVisible: Air pollution, Biodiversity loss (wildlife, agro-diversity), Food insecurity (crop damage), Loss of landscape/aesthetic degradation, Soil contamination, Deforestation and loss of vegetation cover, Reduced ecological / hydrological connectivity, Noise pollution
Potential: Global warming
Health ImpactsVisible: Mental problems including stress, depression and suicide
Potential: Exposure to unknown or uncertain complex risks (radiation, etc…)
Socio-economical ImpactsVisible: Displacement, Specific impacts on women, Loss of livelihood, Violations of human rights, Land dispossession, Loss of landscape/sense of place

Outcome

Project StatusIn operation
Conflict outcome / response:Court decision (victory for environmental justice)
Migration/displacement
Application of existing regulations
Resettlement
Development of alternatives:Alternatives were already on the ground before the construction of this project. Traditional communities (mostly women) used the forest to extract coco babaçu to sell oil and other products. And men used to work in agriculture.
Do you consider this an environmental justice success? Was environmental justice served?:Not Sure
Briefly explain:The court decided in favor of the environmental justice organizations and one of the solutions was the resettlement of the affected communities. But traditional activities such as extraction of coco babaçu by women groups and agriculture activities have been interrupted. With this project the economy and livelihoods of these families have changed changed. The project is in operation.

Sources & Materials

ENEVA official page of the project
http://www.eneva.com.br/en/our-businesses/power-generation/plants-in-operation/Paginas/ute-parnaiba.aspx

Maranhão: MP E MPF Ingressam Com Ação Em Defesa De Comunidades Afetadas Por Termelétricas
https://www.ecodebate.com.br/2015/04/07/maranhao-mp-e-mpf-ingressam-com-acao-em-defesa-de-comunidades-afetadas-por-termeletricas/

Complexo Parnaíba é inaugurado em Santo Antônio dos Lopes, no MA
http://g1.globo.com/ma/maranhao/noticia/2013/11/complexo-parnaiba-e-inaugurado-em-santo-antonio-dos-lopes-no-ma.html

04/05/2016 - ENEVA inaugura o Reassentamento Nova Demanda em Santo Antônio dos Lopes
http://www.eneva.com.br/pt/sala-de-imprensa/noticias/Paginas/ENEVA-inaugura-o-Reassentamento-Nova-Demanda-em-Santo-Ant%C3%B4nio-dos-Lopes.aspx

Comunidades Impactadas pelo Complexo Termelétrico Parnaíba. Mapa da FIOCRUZ
http://www.conflitoambiental.icict.fiocruz.br/index.php?cod=602

Impactos ambientais sofridos por famílias vizinhas a termelétrica serão debatidos em audiência
http://imirante.com/oestadoma/noticias/2015/09/04/impactos-ambientais-sofridos-por-familias-vizinhas-a-termeletrica-serao-debatidos-em-audiencia.shtml

Complexo Parnaíba de geração de energia é oficialmente inaugurado
http://www.abegas.org.br/Site/?p=29915

SANTO ANTÔNIO DOS LOPES - MPMA e MPF ingressam com ação em defesa de comunidades afetadas por termelétricas
http://www.carlinhosfilho.com.br/2015/04/santo-antonio-dos-lopes-mpma-e-mpf.html

MA – Comunidade denuncia empresa Eneva (ex-MPX Energia S.A.) por descumprimento de acordo, poluição e violações de direitos
http://racismoambiental.net.br/2014/07/18/ma-comunidade-denuncia-empresa-eneva-ex-mpx-energia-s-a-por-descumprimento-de-acordo-poluicao-e-violacoes-de-direitos/

Other documents

BRIGA COM PODEROSOS – resistência camponesa face à expropriação por grandes projetos em Santo Antonio dos Lopes, MA Thesis
https://file.ejatlas.org/docs/2415/Benedita_de_Cassia.pdf

Meta information

Contributor:ENVJustice (G.N)
Last update18/08/2019

Images

 

Thermal Power Plant Parnaíba

 

Quebradeiras coco babaçu, tradittional activity.